Santana Row Construction October Pictures

 

October Photos:

The photos below show illustrate how the podium deck is being formed.  Post tension cables are being placed followed by concrete poured on top.  The next phase is to commence on framing. 

 

Post tension cabling going in before the concrete is poured.

santana row

Pouring the concrete.

santana row concrete pouring

Half of the concrete slab for podium deck is completed.  This was actually 2 pours, each taking 8 hours each.  It then takes 3 days for the concrete to dry. 

concrete poured at santana row

Framing has begun.

framing begining

Framing continues on podium deck.

framing at santana row

Concrete bring poured over post tension cables on second half of podium deck. 

framing at santana row